Laminate flooring is a good alternative to wood flooring in basements.
How to lay laminate on cement floor.
It is necessary for them to adapt to the humidity and the temperature of the.
Remove any carpet or other flooring.
You ll also want to tear up any carpet in the room and remove the leftover tack strips.
Next cut strips of underlayment to size and lay the strips down across the exposed floor.
Make a final check with the level to be sure all the high and low spots are gone.
How to install laminate flooring over concrete.
Multiply length times width of the room.
If you have a vinyl floor you may be able to install your flooring directly on top of it.
In colorado dry basement built 1961.
The previous owner put the really old style tiles on top of concrete.
Before you install file flooring follow the directions above for fixing high spots and low spots in a wood or concrete subfloor.
The laminate flooring is cheap and comes in a large diversity of colors thicknesses and finishes as you can easily find one to fit your needs and tastes perfectly.
If the floor is uneven you need to address a few things to create a flat floor for the laminate flooring.
Many types of flooring can be installed over a concrete sub floor.
Moreover the laminate flooring is easy to maintain and durable if you clean it regularly with appropriate products.
No matter the weather or season a laminate wood floor should be a silent expanse that runs through your living spaces.
This article is about how to lay laminate flooring on concrete.
Then vacuum the floor with a wet dry vac or sweep it with a broom.
My contractor wants to install laminate on top of floor.
Before the installation itself leave laminate boards in the room for some time.
To lay laminate flooring first clear out any furniture in the room you ll be laying the floor in.
Laminate flooring is also fairly easy to install.
Add about 10 to that number to account for any possible mistakes and warped boards.
There are also tiles missing here and there.
If you lay the laminated flooring on new concrete floors you must know that the period of the complete drying is about 80 days.
When installing a laminate floor on top of old tile on top of concrete basement floor.