Specialist calcium sulphate flow screed would be 15 mm.
How to lay a cement floor screed.
3 sands or 1 portland cement.
Therefore you have to lay the screeds on the floor every 3 and you should use a spirit level to make sure they are perfectly aligned.
Added to that cement type grade of aggregate and the method of storage of screed material influence the mix ratio to a certain extent.
Modified sand and cement screed fast drying rapid strength type product you would be looking as thin as 10 mm.
Next pour about 1 inch of screed onto the floor and lay down long wooden battens to divide the room into 10 foot wide strips.
Curing in this instance means dried out slowly and a floor screed needs to retain its moisture for as long as possible.
The easiest method to screed your concrete floor is to use 2 2 wooden screeds or 3 3 4 4 if you need a thicker layer of screed.
Once they are leveled fill in the strips one at a time until the entire floor is covered in screed.
3 part series on insulating screeding tiling and grouting a travertine floor.
Then combine the screed mix with water so it s the consistency of paint.
If the thickness of the floor screed does not exceed 40mm then the recommended mix is 1 portland cement.
Floor screeds should be cured rather than just dried out quickly.
The cement is budget so it is widely demanded but it needs to be laid in a layer of 2 cm otherwise the desired effect will not be achieved.
Sand and cement bonded would be 40 mm for a traditional one to four mix.
Therefore a suitable type of cement shall be selected and sand needs to be free of deleterious materials.
3 coarse aggregate 10 mm maximum aggregate size should be considered if the floor screed thickness is greater than 40mm.
If you are looking to lay thin floor coverings and looking to take out the imperfections of the substrate.
This is necessary because of the high cement content and rapid drying could lead to cracks.