This will give the floor more strength and look more natural.
How to install laminate floor on concrete basement.
Stagger the seams so there is no clear break line.
If you have a vinyl floor you may be able to install your flooring directly on top of it.
Connect several laminate floor planks using the tongue and groove pattern on the material.
Multiply length times width of the room.
During installation make sure you leave an expansion gap of 1 4 on all sides.
If you have some experience with installing flooring or are diy hobbyist it shouldn t take you more than a day to install vinyl plank flooring on concrete.
Here s a tutorial on how to install laminate flooring.
Install a plastic vapor barrier.
Measure the basement accurately so that flooring fits well.
Add about 10 to that number to account for any possible mistakes and warped boards.
Determine how much flooring and materials will be needed.
Your contractors have the necessary equipment to cut floorboards and ensure they are neatly shaped.
This will help to acclimate the flooring to the room temperatures and humidity.
Lay in place and tap with a rubber mallet to position flooring against one wall.
Place the laminate flooring on the concrete slab in the room where it is to be installed.
If it has your basement may be too moist for a laminate flooring installation.
At the end of that time lift the squares to see if moisture has accumulated on the bottom of the plastic.
Repeat until the entire space is covered.
If your concrete passes the moisture test then plastic sheeting at least 6 mils thick will prevent moisture from getting into your laminate flooring.
Cut plastic garbage bags into squares and then tape them to the floor in various places around the basement.
Remove any carpet or other flooring.
Get the installation professionally done so that floorboards are cut to precisely each corner.
Start installing laminate flooring by matching their tongue with the groove.
Then leave them for three days.
Apply firm pressure when pushing the planks together.
Leave the flooring in the room for three days before installation.