Esd flooring also referred to as static control flooring is an encompassing term for flooring materials and systems designed for use within esd sensitive environments.
How to install esd flooring.
In many cases larger electronics companies utilize members of their own in house facilities department for their static control flooring installation.
These floors come in a number of styles.
If the copper is applied directly to bare concrete or another subfloor it will need to be covered with conductive adhesive during the installation.
Bs en 61340 5 1 and iec 61340 compliant.
That s where esd flooring products come in.
Esd floors are no more difficult to install than ceramic flooring regular carpet or conventional tile.
Some but not all esd floors also prevent charge generation i e static from accumulating as people walk.
Esd flooring installation is not some kind of black art.
Thus reducing the chance of someone creating a static discharge through physical contact.
Ecotile esd flooring is available in a heavy duty 7mm thick tile that can be used with fork truck and.
Esd flooring is created from a combination of materials including carbon fibers that transfer the electrostatic charge from a person to the flooring.
Made in the uk.
Install a few pieces of the flooring material selected for the installation and adhere to the substrate with the recommended adhesive.
Esd flooring standards are based on an esd flooring footwear combination.
This directed and intentional flow of electrical current and discharge helps to greatly reduce or eliminate the.
Conductive dissipative and anti static electro static discharge floor tiles manufactured in the uk.
An esd flooring system serves as a conduit for electrical static charge known as bvg or body voltage generation accumulation on a person from movement across a polymer floor to discharge to a desired controlled ground point.
In any environment the movement of people and objects create constant risks of electrostatic discharge from a host of sources.
The strap can be placed directly on the concrete subfloor in advance of installation or pressed into the conductive adhesive during installation.
A bond test shall be performed on all substrates prior to full scale application of the esd tiles.