The primary goal of the shower base is to create a sloped floor angled toward the drain so the waste water flows efficiently into the pipes.
How to install a ceramic shower base.
Easy by brewing up a nice hot cup of joe and w.
Curb or curb less shower.
Secure the backer board to the studs with concrete backer board screws not drywall screws.
Time to replace that old nasty shower.
What do you do.
Use a starter board as a straight edge whenever you do a vertical tile installation to ensure panels go in straight and level image 1.
But if you re thinking of installing a tile shower floor you ve got some decisions to make when it comes to your method of installation.
Temporarily place tiles along the wall sitting on top of the tile spacers.
3 popular choices for a custom shower pan.
Then you ll need a new shower pan.
Select one the same length as the tub and you won t even need to add filler walls.
Since the drain position roughly matches the tub drain you may not have to add a separate vent cut out and patch the floor or reroute the drain line.
Where do you start.
An important decision you have to make when planning your walk in shower is choosing the type of floor you want to install and i m not talking about materials which is something else you need to decide later on.
Attach the membrane to the studs with large head nails at least 8 from the bottom of the form.
Select a shower base that has the drain located at one end right or left chosen to match your old tub drain.
You might need a helper for this part to hold the backer board in place while you attach it.
It s a good idea to mark the studs before installing so you know where to drill.
Materials and tools needed.
Some of the basics required include.
Due to the premolded slope.
For the floor of your shower or shower pan there are two basic options.
The base needs to have a drain an edged frame and tiles for the decorative finish.
Place tile spacers flat side down along the shower base where it meets the shower base flange.
Use shims at the base to set a 1 4 inch expansion gap.
In our project we installed the board on the shower wall at 72 1 2 from the top.
Screw the starter board directly into the cement board and remove it after completing a series of panels.