In this video i show you the method that i use to attach basement framing to a concrete floor.
How to fix stud to floor of basement.
Matching the exact length of the studs is vital.
Thre ways to fix a sagging or sloping floor.
After the primer has cured mix the compound and spread it onto the floor up to 1 2 inch thick with a floor squeegee.
Most compounds require that you first coat the floor with a primer.
If the new stud is too short it will not support the plate and roof.
Add 2 by 4 lumber to a 2 by 4 stud wall or 2 by 6 lumber for a 2 by 6 stud wall.
Technically speaking your basement floor is made of concrete of which cement is one of several components.
That s not the best way however if constructing a wall in a basement where the concrete floor is out of level because the wall may be too high or too low in spots when tipped up.
Depending upon the conditions it is possible to strengthen or repair existing framing members such as floor joists or roof rafters by adding reinforcing material sandwiching the member on either side with plywood is sometimes worthwhile but the plywood must be installed correctly for greatest strength.
By jacking up the ceiling of the basement you.
Self leveling concrete is a liquid mortar that you pour and spread onto a sloped rough uneven but structurally sound floor.
Place support of the floor joists with wood studs.
I use tapcon concrete screws to secure the wood to the floor.
Use the same type lumber as the rotted studs.
If the new stud is too long it will push the top plate up and can affect the roof position.