Locate and mark the center mark for the newel post and place a pencil mark on the concrete where the newel post.
How to fix newel post to floor.
You just need 4 six inch long rail.
When you re securing a newel base to the floor check for any pipework wiring and alarm or telephone wires before you.
How to fix a wobbly newel base to a step or the floor using a countersink pilot hole bit drill at a 45 degree angle through the staircase tread down towards the newel post.
The bit must be at least 6.
Once up leave it.
Comes with the components and hex key bit needed fix the newel post to the floor.
How to install a stair newel to a concrete floor step 1.
You just need 4 six inch long rail bolts.
Install the lag bolts to secure the post to the floor.
Drill pilot holes through the lag bolt or screw holes on the sides of the anchor.
Make sure that there are no gaps between the post and tenon shoulder the dowels or bolts should pull this into place.
Bolting a newel post down to the top of the floor is easy.
Bolting a newel post down to the top of the floor is easy.
Set the wooden post in place on the wooden floor.
Drill into the concrete with a hammer drill fitted with a 9 16 inch masonry bit.