The variety of decking materials and variables is overwhelming.
How much decking do i need for 10m2.
To determine exactly how much decking material you need for your new deck please fill in your desired specs into our calculator above.
Dsa deck surface area in square feet deck length feet x deck width feet.
To determine how much stain you will need use our calculator to help you out.
2 x 8 10 foot pressure treated pine.
You also don t want to have a lot of stain left over either.
5 4 x 6 10 foot pressure treated decking.
This calculator uses standard 2 x 6 pressure treated lumber for decking available at most hardware stores.
It also assumes floor joists are 16 inches apart and 6 x 6.
When you have decided to stain your deck you can be left wondering how much stain you need to buy.
If you need both you can still use the calculator to estimate how much material you ll need for the deck itself.
Add 10 percent to framing and 15 percent to decking to allow for waste.
12 foot 2 4s 8 foot 2 6s and so on for all framing members including stairs and railings.
However if you re unsure what to put in some of the fields please keep the following deck calculation tips in mind.
Depending on the finished look you want to achieve you ll need to determine just how much material you ll need to carry out your deck design plans.
Order online with gripdeck.
For a small deck 10 12 feet for example determines how much lumber you ll need by using your detailed plans to count all the pieces of each size.
With the frame of your deck built one of the final steps is overlaying the substructure with decking materials.
If the area you are decking is not a simple rectangle then you will need to divide it into rectangles and calculate each area individually.
12 x 12 deck design 144 sq.
Use our deck flooring estimator to find out how much material you ll need to complete your project.
Use the decking calculator to estimate how much decking you will need for your anti slip decking project.
2 x 4 10 foot pressure treated pine.
It is not fun to get started on a project and realize shortly into it that you don t have enough supplies.